[Poster Presentation]Application of Video Synchronos Monitoring Technology on Double Terminal Voltage in Submarine Cable Voltage withstand Test

Application of Video Synchronos Monitoring Technology on Double Terminal Voltage in Submarine Cable Voltage withstand Test
ID:129 Submission ID:39 View Protection:PUBLIC Updated Time:2020-10-15 19:15:22 Hits:259 Poster Presentation

Start Time:2020-11-04 14:35 (Asia/Shanghai)

Duration:5min

Session:[G] Poster session » [G4] Poster Session 4 and Poster Session 9

Abstract
The Zhoushan 500kV interconnection project is the first power transmission line using 500kV XLPE submarine cables in the world. In the 500kV submarine cable withstand voltage test, due to the long length of the submarine cable line and the high operating voltage, in order to ensure the safety and stability during the submarine cable test, it is necessary to perform real-time comparison and calculation of the voltage at both ends of the submarine cable. In this paper, a dual-terminal voltage video synchronization monitoring technology is adopted to transmit the voltage information of the far end of the submarine cable to the near end in real time through the Internet, thereby realizing the data synchronization of the submarine cable withstand voltage test. The field test results prove that the scheme can meet the design requirements and provide a guarantee for the safe operation of the submarine cable test.
 
Keywords
Power safety,Submarine cable,video synchronization monitoring,withstand voltage test
Speaker
Jian He
Electric Power Research Institute;State Grid

Submission Author
Jian He Electric Power Research Institute;State Grid
Comment submit
Verification code Change another
All comments
Log in Sign up Registration Submit