[Poster Presentation]Design of a special crawler crane for substation

Design of a special crawler crane for substation
ID:262 Submission ID:1661 View Protection:PUBLIC Updated Time:2020-10-28 23:28:43 Hits:276 Poster Presentation

Start Time:2020-11-04 15:55 (Asia/Shanghai)

Duration:5min

Session:[G] Poster session » [G6] Poster Session 8

Abstract
The internal construction site of the substation is narrow, and it is usually necessary to temporarily dismantle and remove the electrical equipment to expand the scope of the power outage in the station, which affects the normal electrical equipment work and increases the maintenance workload. This paper designs a crawler crane for substation construction, which is aimed at the spatial structure layout of the substation and makes full use of the telescopic structure and remote infrared control method to reduce the occupied space and reduce the scope of power outages. It has both a lifting arm and a manned arm, realizing the multifunctional integration of manned and lifted objects. This crane breaks through the limitation of the single structure of the traditional spreader, and can temporarily replace a variety of spreaders for efficient lifting construction.

 
Keywords
reduce the scope of power outages;multifunctional integration;substation construction;crawler crane;telescopic structure
Speaker
Longbin Zhang
China Three Gorges University

Submission Author
huashen Guan Jiangmen Power Supply Bureau of Guangdong Power Grid Co.,Ltd.,Jiangmen,Guangdong 529000,China
longbin Zhang China There Gorges University
Hongyang Zhang Jiangmen Power Supply Bureau of Guangdong Power Grid Co.,Ltd.,Jiangmen,Guangdong 529000,China
Guofu Sun Jiangmen Power Supply Bureau of Guangdong Power Grid Co.,Ltd.,Jiangmen,Guangdong 529000,China
Zhaoxin Chen Jiangmen Power Supply Bureau of Guangdong Power Grid Co.,Ltd.,Jiangmen,Guangdong 529000,China
Comment submit
Verification code Change another
All comments
Log in Sign up Registration Submit