[Poster Presentation]The Development of Jiangsu Power Grid in 2016-2020

The Development of Jiangsu Power Grid in 2016-2020
ID:269 Submission ID:1192 View Protection:PUBLIC Updated Time:2020-10-18 11:14:14 Hits:332 Poster Presentation

Start Time:2020-11-04 15:45 (Asia/Shanghai)

Duration:5min

Session:[G] Poster session » [G6] Poster Session 8

Abstract
In the past five years, Jiangsu power grid has formed a "six verticals and six horizontals" transmission grid. At the same time, social power consumption and the installed capacity of 220kV and above transformers continues to reach new heights. In this paper, we analyze the achievements of Jiangsu power grid in the past five years, combine with the power grid statistics such as social power consumption and dispatching power in Jiangsu. Based on these statistics, we try to analyze the development trend of Jiangsu power grid. Finally, we point out a few hidden trouble of Jiangsu power grid, and provide appropriate proposals for the development plan of the next few years.
Keywords
Jiangsu power grid,power grid statistics,proposal,social power consumption
Speaker
Zhongxi Liu
Jiangsu Keneng Power Engineering Consulting Co., Ltd.

Submission Author
Zhongxi Liu Jiangsu Keneng Power Engineering Consulting Co., Ltd.
Hao Tian Jiangsu Keneng Power Engineering Consulting Co., Ltd.
Comment submit
Verification code Change another
All comments
Log in Sign up Registration Submit